Estimate how much soil, rock, or mulch you need for your project. Results are approximate — we recommend adding 10–15% overage.
Estimate topsoil needed for raised beds, lawn installation, or grading. Density used: 1.1 tons per cubic yard.
Based on 1.1 tons/yd³ for topsoil. Add 10–15% overage for settling and waste.
Select your material type — density varies by aggregate. Results in cubic yards and tons.
Add 10–15% overage. Road base density increases after compaction.
Standard mulch bags are 2 cubic feet. Recommended depth is 2–4 inches for landscaping beds.
Bulk mulch (by the yard) is more economical for larger projects. Add 10% overage.